The stages of building a house, in order

Building a house goes wrong in predictable places: work starts before the permit lands, or the plumbing is tested after the walls are closed. The order below exists to stop that. Each phase ends with something you can point at, so you always know whether it is actually finished.

6 phases30 stepsFree

The flow

Every phase in order, with what you are holding at the end of each.

Try it · tick steps below

Nothing is saved here. Start a project to keep it.

0 / 30 ticked

  1. 1

    Planning & approvals

    Lock the budget, the design, and the paperwork before any work starts.

    After this phase: Approved drawings and a signed contract

  2. 2

    Site preparation & foundation

    Clear the site and get the structure's base right.

    After this phase: Foundation cast and inspected

  3. 3

    Structure

    Columns, beams, slabs, and walls.

    After this phase: Walls and roof slab standing

  4. 4

    Services rough-in

    Everything that hides inside walls and floors.

    After this phase: Pipes and wiring inside the walls

  5. 5

    Finishing

    Turn the shell into a home.

    After this phase: Rooms painted and fitted out

  6. 6

    Handover

    Check everything, close the accounts, move in.

    After this phase: Keys, certificates, and warranties