Blog
Practical writing on planning long work, phase by phase.
Short pieces on method and construction. No news, no roundups — only things you can use on the next project.
A list
Tells you what is left.
A flow
Approvals
Ordering
Services
Tells you what is next — and what may not start yet.
Latest
3 postsMethod · 5 min
Why phases beat to-do lists for work that takes months
A list tells you what is left. A flow tells you what is next, and what is not allowed to start yet.
Read →Construction · 7 min
The six phases of building a house, and what to check before leaving each one
Two of these six phases cannot be undone once you have left them. Those are the ones to slow down for.
Read →Method · 5 min
How to write a checklist people actually follow
A checklist is abandoned for one of two reasons: it asks for a judgement, or it lists things nobody would forget.
Read →Prefer to see it than read about it?
Read a finished flow first
Every method post ends with the same advice: start from a finished template, not a blank page. The ready-made flows are those templates.
Browse ready-made flowsPut it into practice
Build your first flow, or start from a ready-made one, in a couple of minutes.